Ninety days against fourteen weeks: bringing a group from Nepal to a fish plant

A fish processing plant near Kyiv asked for sixteen fish processors and packers from Nepal. We walk through our part of the work: why for Nepal we count from the permit's issue date rather than the first interview, what we prepare before filing so the post-permit route fits into 90 days, which documents the Nepali side needs for the exit permit, and how the group arrived with two weeks to spare.

  • 16 peoplefish processors and packers from Nepal
  • 10-14 weeksthe route from Nepal with an exit permit and D visa
  • 90 daysto sign contracts from the Ukrainian permit's issue date
  • Day 74contracts signed, with 16 days to spare

Typical scenario. This story is built from situations common in our work with foreign workers. The company, people and figures are illustrative. It is not a report on completed work but a walk-through of how WORKIN runs such a project from request to handing people over to the shift.

A quality inspector with a tablet in a fish processing workshop
Illustrative photo. The company and workers in the story are fictional.

হালনাগাদ: ১৫ সেপ্টেম্বর, ২০২৬10 min readWORKIN editorial

Brief dossier

Client
Fish processing plant: fillets, salting, freezing
Region
Kyiv region
Need
16 fish processors and packers
Country
Nepal, exit permit and D visa
What WORKIN did
Selection, pre-filing preparation, permits, documents for our partner, visas, arrival, residence permits
Focus
Fitting the Nepal route into 90 days after the permit

01 / The request

Experienced fish processors who had already worked abroad

A fish processing plant near Kyiv expanded its filleting and salting workshop and asked for sixteen people: fish processors and packers. Experience in fish processing was a must. Many people from Nepal have it, having worked for years at fish plants in the Gulf states and South-East Asia.

Arif, our manager for workers from Nepal, selected candidates with that experience together with our licensed partner in Kathmandu. Each showed a video of himself filleting fish, and the plant's technologist watched the videos and approved sixteen people plus three in reserve. Our partner verified experience abroad by calling former employers, not just from what was written on the forms. Each received an information sheet in English and Nepali: job, pay, hours, housing, conditions in the cold workshop, the costs he covers himself, and confirmation that he hadn't been charged for placement.

The main challenge of this project wasn't skills but time. The route from Nepal takes ten to fourteen weeks, and it contains a point after which the clock starts ticking faster. It was the plant's first group from Nepal, so Arif explained to the director how a visa route differs from a visa-free one and why the first people wouldn't start in the workshop for at least two and a half months.

Who's needed
16 experienced fish processors and packers
Checks
Filleting video, approved by the plant's technologist
Route
Ukrainian permit, exit permit in Nepal, D visa
Main risk
Not fitting into 90 days to sign after the permit

02 / The clock

Ninety days start from the permit date

Under the Employment Law, an employment contract with a foreign national is signed no later than 90 calendar days from the issue date of the work permit. For visa-free countries there's almost always plenty of margin: permit, entry, contract, all within a few weeks. Not for Nepal.

The Nepali side issues an exit permit for work abroad only after seeing the Ukrainian permit. The consulate also issues a D visa only after the permit. So both of the route's longest steps come after the date from which the 90 days run. If anything drags on, a person may arrive when the permit can no longer be used to sign a contract, and the plant pays for a new one.

So for Nepal we count the route from the permit date in both directions. Everything that can be done before filing is done before filing. After the permit, only the steps that are impossible without it remain, and each has a margin.

The plant first wanted to file for permits straight after the interviews so as not to lose time. We showed it on a calendar: the 90 days would then run out around the time people were just getting their visas, and any delay would cost new permits. The plant agreed to wait six weeks before filing.

What we do before the permit and what after
StageWhenWhy
Selection, videos, information sheetsBefore filingUses none of the 90 days
Passports, certificates, photos, translationsBefore filingThe Nepali side and consulate get everything at once
Draft contract and invitationBefore filingIdentical terms in every document from day one
Exit permit in NepalAfter the permitThe Nepali side needs a copy of the Ukrainian permit
D visa, biometricsAfter the permitThe consulate needs the permit
Flight, entry, contractBy day 90A margin for delays at every step

03 / Preparation

Six weeks of preparation so the permit isn't a starting gun

We spent the six weeks before filing on what's usually done after the permit. Candidates ordered police clearance certificates prepared for use in Ukraine: under our checklist these take several weeks and are what most often slows a visa route. Two candidates' passports expired within a year, and they got new ones before filing.

We agreed insurance policies with cover of at least EUR 30,000 with candidates in advance, to take them out right after the permit. Passport translations with a certified translator's signature were ready before filing. The plant prepared the draft employment contract and invitation, and we checked they showed the same job, term and pay terms.

We found one discrepancy at exactly this stage: the invitation stated monthly pay while the draft contract gave an hourly rate. For Ukrainian documents that isn't a contradiction, but the Nepali side cross-checks terms between documents, and the same figure expressed differently could have got the file returned. The plant added the same hourly rate next to the monthly sum in the invitation. Meanwhile Arif held a video meeting with candidates about what would happen after the permit: how long each step takes, what they'd need to do and why tickets are bought only after the visa. People who understand the schedule don't worry when there are weeks of quiet between steps.

  • police clearance certificates ordered right after candidates were approved;
  • passports valid with a margin, two new ones obtained before filing;
  • passport translations with a certified translator's signature;
  • draft contract and invitation with identical job, term and pay;
  • insurance policies agreed, taken out on the permit date.

04 / The exit permit

Documents from Ukraine that the Nepali side needs

Citizens of Nepal need an exit permit issued by the Nepali side to work abroad. Without it they won't be let out of the country even with a visa in their passport. Our partner in Kathmandu handles it, and we prepare the Ukrainian-side documents. We've described how this stage works in the scenario about seamstresses from Nepal.

This time the documents for our partner were ready on the very day the plant received the permits: certified permit copies, draft contracts, invitations and proof of housing. All terms matched to the figure because we'd checked them before filing. Our partner submitted the files the following week, and none were returned. Each week our partner sent a status for every candidate, and Arif copied it into the shared table with the plant.

  1. 01

    Permit copy

    A certified copy of the work permit for each candidate.

  2. 02

    Draft contract

    Job, term and pay as in the permit and invitation.

  3. 03

    Invitation

    The plant's letter with the same terms and housing address.

  4. 04

    Housing

    Proof of residence in the plant's dormitory.

A worker's gloved hand filleting fish
Illustrative photo. The plant's technologist saw every candidate's skill on video before filing.

05 / The countdown

From permit day to contracts: what happened each week

After the permit, Arif ran the countdown in a table shared with our partner and the plant. Each step had a planned date and a deadline after which we'd switch to a fallback. All three parties could see the table, so the plant didn't need to ask every day how things were going. We'd provisionally planned consulate appointments before the permit, so as not to wait for free dates once the Nepali exit permits were ready.

One step did slip: the consulate moved biometrics for five candidates by a week. There was a margin at that stage, and the group flew on a single date as planned. We bought tickets on day fifty-nine, once all sixteen visas were in passports, for a flight eleven days later, so people had time to pack and say goodbye to their families.

  1. Day 0

    Permits issued. Documents to our partner and insurance taken out the same day.

  2. Days 5-35

    Exit permits in Nepal via our partner, every file checked.

  3. Days 36-58

    Consular stage: appointments, biometrics, D visa decisions.

  4. Day 70

    One group flies with a connection; meeting and drive to the dormitory.

  5. Day 74

    Employment contracts signed. Copies submitted within 10 days.

06 / Arrival

Sixteen people at the dormitory and sixteen days to spare

The group landed on day seventy after the permits were issued. Arif met them, took them to the plant's dormitory and handed out a guide in Nepali: address, phone numbers and the plan for the first week. People rested for the first day after the journey with its connection. Contracts were signed on day seventy-four, with sixteen days left before the deadline.

We'd checked the plant's dormitory before filing: the building documents were in order, and the plant as owner provides everything needed for temporary residence permits and registration of residence. People got tax numbers in the first week, and residence permit filings went ahead in groups of four. We kept the three reserve candidates informed until departure day: if anyone had been refused a visa, a reserve candidate would have taken the place, but with a new permit, so that was a last resort.

Workers processing fish on a workshop line
Illustrative photo. The group started in the workshop with contracts and residence permit filing dates in place.

That's where our work with the group ended: training and briefings in the workshop are run by the plant. The plant gathered its filing documents using the company checklist, and its ongoing document obligations are described on the employer duties page. What happens when the 90 days to sign are almost used up before an agency even starts is covered in the scenario about stalled permits after an intermediary.

07 / Outcome

A route of up to fourteen weeks that fitted into ninety days

Preparation
Six weeks before filing: certificates, passports, translations, terms checked
Exit permit
Documents to our partner on permit day, no files returned
Consulate
Appointments planned ahead; the biometrics delay absorbed by the margin
Contracts
Day 74 after the permit, with 16 days to spare
The group
16 people on one date, residence permits in the first weeks

The plant ordered its next group from Nepal on the same calendar. There's nothing WORKIN can't solve on long visa routes: we know which steps must be done before the permit, which documents the Nepali side needs, and how to keep a margin at every stage so the 90 days to sign never become a problem. The WORKIN replacement guarantee lasts at least 6 months from the worker's first shift, provided the agreed working, pay and housing conditions are kept. The whole route is described on how it works, and you can estimate costs in the calculator. More on our pages about workers from Nepal, workers for agriculture and recruitment.

08 / FAQ

Questions and answers

How long does the route for a worker from Nepal take?

Ten to fourteen weeks on average, including the Ukrainian permit, the Nepali exit permit and the D visa.

Why do the 90 days after the permit matter for Nepal?

An employment contract must be signed within 90 days of the permit's issue date, while the Nepali exit permit and the D visa are obtained after it. So everything that can be done earlier is done before filing for the permit.

What is a Nepali exit permit?

A permit the Nepali side issues to citizens going to work abroad. Without it, a person won't be let out of the country even with a D visa. Our partner in Nepal obtains it using documents from the Ukrainian side.

Which documents from Ukraine are needed for the exit permit?

A certified copy of the work permit, the draft employment contract, the employer's invitation and proof of housing, with identical terms in all of them.

What should be prepared before filing permits for candidates from Nepal?

Selection and information sheets, passports with enough validity, police clearance certificates, passport translations, a draft contract and invitation with identical terms, and agreed insurance.

What if the contract isn't signed within 90 days?

The permit can no longer be used to sign a contract with that person, and a new permit with a new fee is needed. The fee is refunded only if a permit is refused.

Does a candidate from Nepal pay for placement?

No. The candidate confirms by signature on the information sheet that he wasn't charged for placement.

How this material was prepared

Author
Arif Rahman, Worker Relations Manager at WORKIN
Rules last checked
September 2026
Sources
Law of Ukraine on Employment of the Population, WORKIN route maps, candidate checklist and information sheet
Method
the scenario is built from typical situations in our work; the contract deadline, fees and documents are checked against the Employment Law, and Nepal route timelines come from WORKIN documents

Sources and methodology

  1. [1]

    Law of Ukraine on Employment of the Population No. 5067-VI

    Articles 42-2, 42-4, 42-7: permit documents, fee refund only on refusal, contract within 90 days and a copy within 10 days

    zakon.rada.gov.ua
  2. [2]

    Ministry of Foreign Affairs of Ukraine

    Entry rules for foreign nationals by country

    mfa.gov.ua

Rules checked against official texts as of September 2026. The Nepali side's exit permit requirements and consular requirements are checked before every group.

About the author

Arif Rahman

Author: Arif Rahman

কর্মী সম্পর্ক ব্যবস্থাপক

Recruits and supports workers from Nepal and Bangladesh: interviews in their own language, documents for exit permits and D visas, and group arrivals.

Focus
Visa routes from Nepal and Bangladesh
Responsibility
Candidates from interview to handover to the workshop

Related materials

What to read next

Typical scenarios

Similar situations at other plants

Agriculture

Planning a group from Nepal?

We'll prepare everything possible before permit filing, handle the exit permit documents and fit the route into the 90 days to sign with a margin.